News

Back to news overview

Mazarine Energy & ETAP discover oil in Chouchet El Atrous-1

The Hague • 01-05-2015

Mazarine Energy B.V., a private international upstream oil and gas exploration and production company, is pleased to announce that its subsidiary, Mazarine Energy Tunisia B.V., and partner ETAP (Entreprise Tunisienne d’Activités Pétrolières) have discovered 38m of net oil-bearing reservoir in well CAT-1 well in the Zaafrane permit in central Tunisia.

The main objective of the well CAT-1 was to test the hydrocarbon potential of the Ordovician El Hamra and El Atchane formations. Extensive logging and sampling proved the El Hamra and El Atchane sands to contain 19m and 19m of net pay respectively. During a production test, the Cat-1 well flowed, constrained by surface facilities, at a rate of 4,300 barrels of oil per day and 395,000 cubic meters of natural gas per day. The CAT-1 well is the first well in a two-well drilling campaign.

The Zaafrane permit spans an area of 5,168 square kilometres within a historically prolific oil- and gas producing region. Mazarine Energy is the operator of the Zaafrane permit, with ETAP and MEDEX as partners. The well was drilled by CTF (Compagnie Tunisienne de Forage) to a total depth of 3,950m.

“We are delighted to announce the first discovery in the Zaafrane permit. The CAT-1 well is not only a success in its own right; it also upgrades the resource potential of a string of prospects in this large permit, notably DGH-1, our next well in the sequence,” said Mazarine Energy Executive Chairman Edward van Kersbergen. “We look forward to the fast-track development of this discovery.”

Other news

El Faouar, Kebili, Tunisia • 22-03-2023
Medical Caravan

This caravan provided free check-ups and specialist medical assistance to people in the region.

The Hague • 26-10-2021
SMG-1 well onstream

Mazarine Energy is pleased to announce that after publishing in the Official Gazette the SMG-1 well in the Sidi Marzoug concession has been brought onstream on 7th October 2021.

The Hague • 26-10-2021
SMG-1 well onstream

Mazarine Energy is pleased to announce that after publishing in the Official Gazette the SMG-1 well in the Sidi Marzoug concession has been brought onstream on 7th October 2021.

More news